Golazo
For a Golazo sports event at the Groenplaats in Antwerp, we handled the delivery and installation of several office containers. To make optimal use of the available space, the containers were placed on two levels.
The stacked office containers were connected by an external staircase structure, making both floors easily accessible. This created additional work and organisational space without the entire setup taking up much ground area.
This project shows how flexibly office containers can be used. Even at locations where space is limited, a tailored setup allows us to provide the temporary space that is needed.
